The Problem
Trenchless rehabiliation of main sewer line under concrete slab in Retail Commercial Complex.
The Solution
The liner was laid out and loaded with epoxy resin, then blown through invertor machine to reline complete section of 150mm cast iron pipe, over a distance of some 50m.
The Result
The sewer pipe relining came in on time and on budget. Repairs were 100% effective.