The Problem
A large scale pit rehabilitation, working in hazardous toxic environment. The pit had structural damage and required composite patch repairs to existing leaks, requiring complete relining and finishing.
The Solution
The Asset Rehab team stripped, cleaned and recoated the pit utilising special adhesive compounds. The site was open air, hence a temporary scaffold frame cover was constructed to shelter the site during works. Waterproofing and sealing as well as patching were undertaken.
The Result
The job was turned around in a short time frame during Sydney’s wettest week on record and within the shutdown period, hence causing no disruption to site production. Repairs were 100% effective.