The Problem
Several Trade Waste Pits pits at the one facility required rehab and pipe relining. The pits serviced varying trade wastes. Water ingress and pit deterioration required waterproofing and relining.
The Solution
Remote CCTV inspection of the pipes via the access pits is carried out to determine extent of rehab required. The images show the inspection phase of existing pics and the types of deterioration typically evidenced. The pits and pipe components underwent rehabilitation and relining.