The Problem
Trade Waste Pits requiring Rehab.
The Solution
Several pits at the one facility serviced varying trade wastes. Water ingress and pit deterioration required waterproofing and relining. Remote CCTV inspection of the access pits is carried out to determine extent of rehab required. The images show the inspection phase of existing pics and the types of deterioration typically evidenced. The pits are now currently undergoing rehabilitation.